Loading

This is default featured post 1 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.

Interior Design

Design a house which is ideal and in love many people. you will also get a few tips on this at this website.

The place is cozy and save

Comfortable place also affects the harmony of your family. Try looking here

Building materials

Here we also reviewed the building materials are appropriate for you to use building.

Building the right structure

Building structure is very important in Think when you are building.

All About Building

You will get everything about building on the site....

Sabtu, 29 Oktober 2011

BETON MIX INSTAN


Almost just add waterEconomical packagingQualified with a guaranteed qualityINDOKON construction of concrete is dry / dry concrete, consisting of a mixture of sand, gravel and cement homogeneously mixed and packed in bags of 50 kg bag / sackINDOKON used for concrete work, whether in the form of the floor / screed, floor equipment, practical columns / column binding, columns, beams floors and other concrete action.INDOKON It is suitable for use in construction projects, home renovations or both hygiene and limited space for construction materials and sanitary requirements of the project is required to store.INDOKON easy location that does not allow use of concrete ready mix and the difficulty to obtain good quality material to achieve.INDOKON Produced in a variety of different types for use in accordance with the quality of the concrete into the desired / required.
Undeniably, the process of building a conventional building in the manufacture of concrete work (by buying and mixing cement, sand), so limitations, including:

   
1. The quality of the raw materials are not guaranteed and not all materials can be used in the manufacture of concrete.
   
2. The manufacture of concrete requires special skills to get the right mix of concrete and materials to create accurate. (Quality, composition, and ways of mixing which is usually not true and not homogenous / not flat).
   
3. The implementation is not practical where the ordering of goods is quite difficult, the project site to be dirty, lost material to be hoped that material can interfere with the labor and materials interfere with the others).
   
4. HIGH COSTS The costs attributable to the supervision, the pace of work longer.

Using INDOKON avoid the above problems, because INDOKON among other benefits:BENEFITS:

   
1. STANDARD OPTIONS High quality ingredients with a blend of: cement, sand, etc. are carefully selected.
   
2. The process of production with strict quality control of products of high quality.
   
3. Consistent quality of work: work better because it uses the same quality of material.
   
4. Efficiency and effectiveness time and costs:
          
* MORE SHORT term (which ultimately will save labor costs).
          
* Use materials that are efficient, produce less waste (residual).
          
* Does not require a lot of material to accumulate.
          
* Cleanliness and purity better project.
   
5. PRACTICAL & EASY not to hoard and mix the material as it should only be mixed with water and can be used directly.
   
6. REFERENCE PROJECT from building high-rise and commercial buildings in Greater Jakarta with INDOKON that is proof of confidence in the quality of the product - product INDOKON.

mixture of cement

When building a house, often we are faced with technical obstacles. For example, the process of making forms for concrete columns and beams. Another obstacle is the implementation of the wrong building, so the quality decreases. In fact, these things happen when you know the causes and effects that will occur.
Problems and solutions in the dosage of cement, water, sand, gravel, and is just as interesting. Dose that does not fit the plaster was not optimal. In the measurement, you're too much use of cement, water and sand, while the less. To prevent repeated failures, here are some of the problems associated with cement applications, including solutions that can be done.
1.Semen porous (bug holes)
If the formwork is removed from the concrete structure, it seems uneven concrete and many holes as a nest of insects. This case is often referred to as bug holes. The case of this bug only affects the display banunan holes, and not too much influence on the strength of concrete structures.
Cause
There is air trapped in the concrete mixture. The air is displayed when the process of mixing concrete (normal air content in concrete with 2%).
Solution
You can close a perforated surface with a layer of new cement. The results are more flat and looks neat.
PencegahanGunakan water-based mud oil (one of the additives). Such materials can reduce the bug holes (use immediately before the time of 6 hours, then move on to casting) (Add dough composition of sand on the concrete. The sand will push the number of gaps bugs
2.Pengkristalan (efflorescence)
When the wall construction is completed, the crystals on the surface of the wall (under layers of paint).
Cause
This phenomenon is caused by entrainment of alkaline salts to the surface of the plaster, concrete or brick.
SolusiApabila coating is not damaged by weathering, then wipe with a damp cloth and then wait until dry. After the abrasive surface of the paint, so the pores open, so water and alkali salts easily. After the water and the salt does not come out, then the painting ulangJika coating is damaged then the sanding done to make basic. Let stand until water and salt. After drying ulangJika doing the painting had already appeared, it can be used acian ordinary cement to cover the holes
Prevention
In the exposed cement wall applications, this problem will disappear. If the wall with paint, can be prevented by wiping the crystals disappear.
3. Concrete volume shrinkage (shrinkage)
Shrink the volume shrinkage of concrete when the concrete began to dry. Lasts up to 3 days after the casting process. This shrinkage can cause cracking of the concrete appears generally in the form of cracks (width 1-2 mm) and non-structural.
PenyebabPengadukan a total of not less baikKualitas baikKomposisi different mortar (a cement content is too much cement and water factor is too high)
Solution
Cracks caused by shrinkage can be improved by injection Member on the cracked concrete.
Prevention
This problem can be avoided by using cuting compound (concrete nurses) performed after the concrete implementation. Compelling the use of compound instructions aimed at reducing the risk shtinkage ctacking. There are two types of curing compound that can gunakanSodium matetial silicate based. Properties have seeped into the concrete and accelerate the hydration of cement to the surface structure. For perfect results to get more done spraying 1-3 hariWax based material. Shaped membrane on the concrete surface layer that controls the rate of evaporation. For applications in the field using a kind of clear beam curing compound

Overcoming Problems in Buildings


Damage to the building structure, often caused by human error (human error), it is because man / employee is primarily the quality is still well below average compared to the development of materials technology itself. Besides humans, the need for resources / money really plays an important role in meeting the quality of building quality due to lack of money, must choose the material that is the low quality / low quality. Of poor quality, then join the age of the building itself is low. To overcome problems with low quality, both in terms of human and material, there are a few tips to cover major expenses with increased structural strength.

1. Cracked Concrete Beams

Structural cracks in the beams with vertical or diagonal pattern, other than that there is the pattern of cracks. The rupture of the concrete beams can be divided into a structure consisting of cracked crack deflection, a pattern of vertical / standing is usually caused by a load capacity of the beam and shear cracks, that a pattern of diagonal / oblique fractures than usually occurs after bending has a vertical pattern to have. Shear cracks may also occur as bars earthquake forces. Apart from the cracking process of the beam may be due to a less than perfect. Small cracks or crazing, many caused by environmental influences. Generally occurs because the beam exposure to sunlight and rain.

3 Alternative solutions:
1. For concrete walls through which there can be a column / pillar of additional small cracks around. The function of this column is to support and distribute the load bar down / foundation to help.
2. For concrete beams under it is not possible, given the additional columns, a first injection of epoxy on the cracks, do dimensional beam expansion with external reinforcement.
3. For small cracks, all done with stucco patch. The purpose of the reinforcing steel is not directly related to the air that can lead to rust.

2. Column Cracks

Cracks in the columns can be divided into three types, the damage that nature does not harm, moderate harm if not immediately addressed. Everything cracks column?
Shear cracks
Cracks with a diagonal pattern / tilt the column is usually called shear cracks that disebakan with violence in the horizontal / flat. Shear crack like this is very dangerous if not treated immediately, because it can lead to column collapse and unable to keep the building.
Bending strength tears
Cracks with horizontal pattern / flat bending cracks are usually called, is caused by excessive pressure on the column. Besides the shear cracks, crack deflection must be carefully handled.
Concrete blanket peeled
Coverage on the peeling concrete column can disebakan by the low quality / quality of the concrete, so the strength of concrete and concrete cover reduced pressure to break easily. Control of the stages of development is needed to prevent loss of quality concrete.
Strengthening curved
Damage to the column the main steel reinforcement seems skewed. In the visible column looks a little crooked. This is due to the lack of number and size or lack of iron binding (brackets).
Hairline cracks in irregular pattern
When the building is still a young age, hairline cracks can be detected. Even hairline cracks are not harmful, but very disturbing scene. These small cracks are caused by environmental influences, namely hot and cold temperature changes drastically. A house built in the summer, after exposure to persistent rain.

3 Alternative solutions:
1. To crack the diagonal and horizontal cracks should be checking the power of the column if the column is still quite strong enough to deal with liquid epoxy joints in the press.
2. If, after the analysis of the column is less strong, it would be necessary to widen the column size. Dilation is done to reinforce the columns so they can withstand the load on.
3. For small cracks, but the addition of reinforcing steel with stucco that are not connected with the atmosphere that can lead to rust.

3. Walls / Floor Cracks

Many cracks in the walls due to a lack of quality concrete basement wall. The quality of concrete is expressed in units of C (example: K-125, K 175, K-250 et seq.) Houses built for this kind of mass-destruction weapons were found. Cracks in the ground as a result of force, which exceeds the capacity of the basement uplift. The movement of soil under the basement floor, causing cracks in basement walls and floors. It can also lead to a break water stopper (rubber base flood).

2 Alternative Solutions:
1. Prepare specialty chemical binding and fast drying (epoxy), then injected / bursting in the area.
2. To stop water cracked should be replaced with new ones.

4. Leaning Fence Walls

We often encounter a sloping wall or fence wall nearly collapsed. Of course evil will happen when the wall collapsed and the surrounding area and passers-by. What are the causes of the wall collapsed wall? The first lies in the lack of a foundation that can not withstand the burden of a fence wall on top, so slanted wall. Second, the wall of the wall exposed to wind loads / encouragement are great. The changing characteristics of the soil around the foundation of the fence, which resulted in the capacity of the soil is reduced, the foundation.

3 Alternative Solution:
1. Digging the soil around the foundation, align the fence with the addition of a lift by strengthening, supporting a wooden / iron fence on the wall.
2. Create a foundation and Sloof behind the fence as a place holder column / pillar.
3. Make a column / pillar to resist slope triangular fence. Size adjustable pole with solid wall load.

5. The first stone down time

Cause:
1. Layer of the soil under the foundation is less dense / less hard and unable to handle the weight.
2. Foundation size is not big enough, not consistent with the burden of building up.
3. Position / location of the foundation is in the corner of soil erosion.
4. Soil properties change due to natural events such as floods, earthquakes.

4 Alternative Solution:
1. Create a new foundation that is close to the foundation down. The goal is to share the burden of excess.
2. Padatkan ground area beneath the new foundation by hand or using a mortar machine, so the capacity of the soil increases.
3. Attach the height of the beams and walls damaged by the fall of the foundation.
4. Create a new pole on the foundation to stop the decline.

6. Ceramic glass, concrete cracks by Floor

Cause:
1. Breakage of the tiles can be caused by the concrete underneath. Concrete floors subjected to loads that exceed the capacity will be cracked / broken. As a result tile that sticks on it cracked / broken.
2. The existence of an earthquake which the concrete floors subjected to shear forces that it experiences the movement. This movement may also cause the tiles on cracks / breaks.
3. The use of quality concrete that is not eligible. For example the composition of a mixture of cement, sand and water that do not fit or use the dirty water can cause cracking of concrete floors.
4. Technical errors in the execution of a concrete floor, errors on susunan.anyaman iron concrete, concrete poured connected, is scaffolding / formwork removed before the concrete is hard enough.

3 Alternative Solution:
1. Remove the floor tiles are broken and swept away cracks in the concrete floor.
2. Give special chemicals to seal cracks.
3. Close the back of the concrete base was repaired with ceramics.

LIGHTWEIGHT BRICK

Brick is a modern lightweight materials replace conventional materials such as brick red. If the red brick house industry worked with the quality varies, then the brick light generated from the process of modern technology by the aeration process and the autoclave, thus ensuring high quality mild brick. Some of the advantages of using lightweight bricks, which is strong, fireproof and soundproof. Due to the ergonomic design, making lightweight bricks are economical in the use of adhesive materials. This time Musikalkita thoroughly discuss the type and use of lightweight brick home. Some tips on the brick light you see this time.
FEATURES BRICK LIGHTDevelopment of materials technology offers comfort and functionality in development. If the presence of a light brick, which was considered more efficient and practical rather than red brick. Mass production and easy as cutting-edge technology is supported, the more it shifts the existence of conventional bricks. Lightweight brick is often called AAC (Aerated) or ALC (Aerated Lightweight Concrete). Forming material and the formula depends on the kitchen manufacturer that is growing and competing. But in general the composition of the silica sand, cement, lime, developers materials (aluminum paste), a little plaster and water. Made of quality materials and testing of scalable, reliable, lightweight bricks provide many advantages for those who use it. What are the benefits? Consider the following presentation.
1. Precision and flat, so it's not hard to make the walls look smooth and neat.2. Stucco and the space savings of up to 75% due to a larger size than brick per day (usually) and a flat surface.3. 50% lighter, so as to minimize the tax structure and easy to transport.4. The sooner the process because of their large size and light weight.5. Soundproofed to the low noise in the room.6. Can menginsulasi heat, making the temperature in the room as stable.7. Compressive strength and the impact is not serious as the earthquake.8. Fireproof, safe in the event of fire.9. The ingress of water is low, so the wall is not easy to wet and dry quickly.10. Environmentally friendly material because 70% air.

Advantages and disadvantages of light steel frame roof


Ever, your roof is leaking, despite repeated several times repaired? Most likely, the cause is the roof horses that are not solid or porous eaten by termites. As a result, rainwater seeps through the cracks tile. Not wanting to constantly terrorized by a problem like this? Replacing the roof of the wooden frame with a lightweight steel roof truss, the correct answer.
If you notice, when more and more homes using lightweight steel roof truss. In Indonesia, lightweight steel roof truss is not new. He has been around since 1995, but the new boom in the 2000s. It is also recognized by Yuyu Yusran Ir.
According to him, lightweight steel roof truss is like a prima donna. Reason than wooden horses, lightweight steel roof truss is more robust, practical, economical design, the price is cheaper and easier to maintain. This condition is very suitable when the government actively combat illegal logging (illegal logging). The presence of steel frames can help preserve the forests. In addition, timber prices are expensive, so many people are starting to lightweight steel roof truss look. ''When you see it from Australia, lightweight steel roof truss is made to restrictions or scarcity of wood to overcome. The use is very suitable for roofs in urban areas. In addition, the price is cheaper than making a roof of wooden construction,''said Yuyu.
Problem strength, lightweight steel roof truss can not be doubted. ''The material is made of aluminum alloy with zinc processed in such a way that strongly support the roof of a material,''said the graduate of Civil Engineering Gadjah Mada University in Yogyakarta. Compared to the strength of wood, can be just as strong. Except, the wood is very good quality. ''Compared to the common wood, strength lightweight steel frame is much stronger. Resistance can reach 15 years.''
In terms of design, lightweight steel roof truss is more efficient than wood. Therefore, the steel material evenly, so the factors that can not be removed.
Another advantage was Yuyu, installation of steel roof truss is very practical. Stay in touch with any tips with steel bolts. Steel roof truss is no need to paint, because of rust resistant.
SaferCompared with wood, lightweight steel roof truss is also safer. Once the evaluation of Ibn Mas'ud, lightweight steel roof truss marketing company PT Arta Gold Eternal. Steel, according to Ibn, has a high elasticity, so it does not collapse immediately broken as once there was an earthquake.
When a fire destroyed would not be crushed fire. This is different from the wooden frame that the fire in case of fire would increase.
''That does not mean fire-resistant steel. At a minimum, if a fire will not spread the fire. To not immediately fall, still going strong. Only defective steels which are replaced completely unnecessary,''said Ibnu.
Of the many advantages, steel roof truss has certain drawbacks. According Yuyu, his weakness is only one installation. Lightweight steel roof truss can not be mounted by anyone. Trained only people who can do. This is because the steel frame construction is calculated in three dimensions in a single unit. Suppose there is only one of improper installation will weaken the other structures.
''The system must be carefully and by people who are experts to be done. If done with proper installation, no need to worry about. To be strong, tile was neat and beautiful. Residents will be comfortable,''said Yuyu.
The price? Quite varied. ''The price depends on size. And usually, the price is a package delivery and installation,''said Ibnu. Just to illustrate, lightweight steel frame type size of 0.80 mm aluminum-zinc offered Rp 140,000 per square meter (Form wall / plain), while the roof form jurai (pyramid) Rp 145,000 per square meter. How very affordable? Reuters vie ...

Anybody want to give me a solution

This month sebetulanya, not a convenient time to build a house. How not to build, is not now the rainy season? But strangely, it seems even koq hardly ever rains, it's just cloudy. And occasional rain patter only. Actually he want anyway, about April's, so the end of this year I can take some time.

But apparently to establish if it is not forced to start, it's becoming severe. Evidently the plan who have been drawn up since 4 years ago always failed, only this time the courage to start. Finally, with a capital of reckless, it was decided to start building. It was reckless second after deciding to go to college first.

Today is the 16th day building the foundation builders. Still not completed correctly, because it was too long to set up and installation of chicken scratch. Today artisans are asking permission to go back to his home in the waterfall, Bogor. A job that is actually responsible, why not settle first, the new home?

So far the costs already incurred to build the foundation course was quite large as well, Rp 24 million, - had spent four trucks of sand, rocks split 3 trucks, 1 truck split stone, about 40 sacks of cement.

Prices sand currently Rp 1,200,000, - pertruk (7 cubic), the rock split Rp 1,200,000, - per truck, cement desert Rp 50,000, -. Foundation work is still unfinished, will be continued again starting December 31, 2008. The plan of activities is divided into 3 parts, the first job is to create a foundation, then wake up to the first floor, last upgraded to 2 floors.

Hopefully the construction of this house can be completed, k and natural.

How to create a foundation / base with the wooden pole into antique and natural.

Create a foundation of reinforced concrete 20 cm x 20 cm x 25 m concrete mixture in accordance with the calculation of the power load on the mast support. Because the wooden pole in the form of antique wood, the design base with designs created with the old model and added the finishing elements of nature, namely leaf motif. Manufacture by confirming Rempelas leaves (leaves that long ago used as a tool to sand the wood surface more subtle). This leaf is used because it is a strong fiber, but is flexible. Attaching the leaves do when finishing of the cement is still wet. In wet conditions, this sheet can be attached to the cement mixture, so the fibers can leave fungal leaf texture look natural. Finish with wet cement is hand made by our tanga, so the shape is not very accurate, it is meant to suggest a natural and rustic impression can be formed in accordance with its antique wooden pole. After finishing the cement dries, we can remove the leaves, leaf fibers agarcetakan clearly. Then sandpaper the parts that are too rough, so that the surface of the base with non-finish was not impressed.

For the final finish, Umpak painted with white paint exterior walls with a mixture of dim, issoproof and white cement. Implemented in phases to paint, so that leaves the fiber mold not covered in paint and white cement. If it is dry, we can effect of moss to make the pores of the fiber matrix by rubbing the leaves of banana leaves on the entire surface of the base and let it for about 2 weeks, the green moss appear on the base them. This moss is not harmful praised the foundation, because the mixture of reinforced concrete, we use a mixture of water-resistant paint and finish that we use to cement and paint isoproof not directly infected by the growing moss. This allows the desired ethnic designs on the pillars of our home field will be realized.


Jumat, 28 Oktober 2011

Creative use google sketchup


If you currently want to build or renovate a house, of course, have an idea of how the dream home you expect. How wonderful if you can make your own graffiti graffiti was then handed over to the builders to be realized.

Google offers a software architecture called Sketchup. Currently available free SketchUp version 6, and 6-pro version paid. No need to spend thousands of dollars to buy the software architecture. Sketchup actually used not only to architecture but also for models of 3D models to create.



Sketchup is only needed for Windows XP-based computer, Windows Vista or Mac OS 10 run. If you want to run in windows, it is necessary framework. Net 1.1, which is usually given in the Windows XP CD. PC with Pentium III 600 MHz processor 128 MB of memory, though little can be used, but for optimum results it is proposed to a computer with a Pentium IV 2 GHz processor 2 GB of memory.


rumahCukup picture a few hours to start making the first model in SketchUp. There are also guided tutorial for the first use. Interface (interface) sketchup is very simple, so that in a few days you will be able to house as a professional architect drawing. If the tutorials do not meet the needs for information, there is an online community that will help you.

In addition to the online community, Google also offers a repository for models created with sketchup. Repository called 3dwarehouse users can search, download and models created with SketchUp models to upload.

Now you can draw your own dream home built or renovated, or just want to test before you paint houses. Ready for the architect of your own home?

Comparison of Brick and Hebel (lightweight concrete)

The sand is a particle of dust is not a good sandy soil can be used in building applications. A good sand usually found on the slopes of the volcano, because of the nature of the volcanic ash deposits can harden when mixed with other constituents of cement. A good feature of the sand is hard, black to gray, no waste in the sand, like the above features can save raw materials are mixed cement used for the installation of brick and plaster. For this type of river sand (Tus) is more suitable for making concrete. Because the more hard and black, in order to bind strongly, but also mixed with cement mixed with limestone buildings. According to the Indonesian National Standards (SNI SK â € "S â €" 04 â € "1989 â €" E: 28) stated on the requirements of sand or fine aggregate and construction materials are as follows: total is a sharp fine grain and hard with a hardness index <2.2. When testing with the eternal nature of a saturated solution of sulphate salts as follows: if used natriun sufat destroyed up to 12%. magnesium sulfate is used as the maximum penalty of 10%. Should not exceed 5% silt and sand containing mud if more than 5% of the sand to wash. Sand should not be too much mengadung organic ingredients, that must be proved by an experiment of color Abransâ € "Harder with a saturated solution of NaOH 3%. The composition of the grains of sand have fineness modulus of 1.5 to 3, 8 and consists of various items. For concrete with a high degree of durability to alkali sand reaction must be negative. Zeezand should not be used as fine aggregate for all concrete quality but with the support of government-approved materials. Agreagat 16 fine for species stucco and sand used must meet the requirements of the couples. Term Limits Gradation of Sand Sifter hole (mm) Weight Translucent cumulative (%) Description: Zone 1 = Zone 2 = Sand coarse sand Coarse Zone 3 = Somewhat fine sand Sand Zone 4 = somewhat subtleDid you mean: Build Houses / Design HouseType the text or a website address or the translated document.CanceledIndonesian translation in DutchNetherlandsEnglishIndonesianToday the construction of the replacement stone horses Hebel beragam.Mulai increasingly using to change the use of plate floors are made of lightweight and not the non-AS using wood horse â € "A horse for the slats and usuknya , but the current trend of people die A steel Ringa met by replacement BEFORE AND Wood.
For the walls, old people tend to have a brick-stone of bata.namun Famous People are satisfied Hebel (lightweight concrete) to use. Lightweight concrete is actually the door USED AS A Swedish Society in 1923, Alternative construction materials BEFORE the deforestation in 1943 to further reduce hutan.Kemudian diJerman Developed Joseph Hebel door. And in Indonesia Self Hebel began to be known since 1995.
Hebel lightweight concrete material from the herd Among visitors is quartz sand, cement, calc, A, A little gypsum, water, aluminum and paste as a developer (Air filler Chemical). Once the dough is perfectly mixed, Will Be Extended for 7-8 hours. Is used aluminum paste in the mixture, working developer ADDITION AS A die-HE It was instrumental in influencing the hardness of concrete. Aluminum paste volume is about 5-8 percent of the dough is made, depending on the desired density. The dough is aerated and has carved municipality.
As for brick brick brick types consists visitors Clay loam, sand calc stones, cement and brick. Meanwhile, in terms of production, A is uh, drove conventional bricks and brick press.For what concerns the size of the Stones 25 x 12 x 4.5 cm smaller in A-Pair inches. FOR Hebel usual size 20 x 60 x 10 cm from the dictation Kleiner's sedikit.Dalam penggunanan brick wall USED AS A FOR-front about 85 buah.Sedang Hebel average â € "average use of 8.5 units.When viewed in terms of price-FOR A single stone varies from USD 375, - / buahnya.Untuk Hebel Rp 650.000, - / m3. So that the average price per Unit â € "an average of Rp 6500, -.. / Fruit DU-A Large Stone 1m2 TO EUR 375, -. Costs X 85 = Rp 31,875, -. (Outside SPE) and Hebel in 1m2 is Rp 6500, -. x 8.5 = Rp 55,250, -. (outside the specification) for the fact Hebel falling prices higher .. but in terms of weight for structured, Faster Lighter Hebel and process.

Home Build / Design Home + architects drawings





Well, it turns out you do not want your architect to work only a minimal, but continue with the next phase. What you ask. Of architectural drawings, you can ask him to create images of structures and Budget Plan to arrange. Is it?
Image texture is an advanced version of architectural drawings. These series of photographs showing the circuit structure of the building from the foundation up to the beams and columns within the building form. In short this: residential building construction drawings can be divided into 2 (two), namely the architectural drawings and structural drawings.
Besides the basic architectural drawing, you can now ask architects to create detailed architectural drawings consist of:a. Foundation drawingsb. Drawings sanitation (clean water, dirty water)c. Drawings bright spotd. Truss drawings
Now that image of the structure was composed of what? Image structure consists ofa. Figure structural reinforcement columnb. Figure structural reinforcement beam and ring Sloofc. Figure structural reinforcement plates (level 2 and above)d. Figure structural reinforcement beams parent and childe. Figure reinforcing structure foundation
In addition to detailed architectural drawings, you can still ask for some additional detail drawings for door, window and above (ventilation). Of course, if you're a little more specifically to that part. For home standard, detailed images in all three parts is not very necessary.
The needs of home building standards, the pictures are enough as a basis for the RAB. Especially if you are already an experienced architect. If the type of building larger, more shopisticated. Working drawings are still needed.
Suppose you want your bathroom is in good shape special design, material or composition. Assuming marble, a combination of natural stone, and others. In the drawings may be necessary, because the builders were not made. Working drawings were actually part of the contractor to make it. As owner, you do not really need working drawings, unless you want to do.
Here are examples of the image structure. Continuation of architectural drawings into a home that once done Annahape Studio.

The best sand for building

The sand is a particle of dust is not a good sandy soil can be used in building applications. A good sand usually found on the slopes of the volcano, because of the nature of the volcanic ash deposits can harden when mixed with other constituents of cement. A good feature of the sand is hard, black to gray, no waste in the sand, like the above features can save raw materials are mixed cement used for the installation of brick and plaster.

For this type of river sand (Tus) is more suitable for making concrete. Because the more hard and black, in order to bind strongly, but also mixed with cement mixed with limestone buildings.

According to the Indonesian National Standards (SNI SK â € "S â €" 04 â € "1989 â €" E: 28) stated on
requirement of sand or fine aggregate well as building materials are as follows:


Fine aggregate must consist of grains are sharp and hard with the index
Violence <2.2.

When testing with the eternal nature of a saturated solution of sulphate salts as follows:
if used natriun sufat destroyed up to 12%.
magnesium sulfate is used as the maximum penalty of 10%.
Should not exceed 5% silt and sand, which
mud more than 5% of the sand to wash.
Sand should not be too much mengadung organic ingredients, which should
shown by the experiments of color Abransâ € "Harder with a saturated solution
3% NaOH.
The composition of the grains of sand have fineness modulus between 1.5 to
3.8 and consists of various items.
For concrete with a high degree of durability to alkali reaction sand
must be negative.
Sea sand should not be used as fine aggregate for all quality
concrete, except with the instructions of the government building
be recognized.
16
Smooth Agreagat be used for plastering and species should be applied
eligible spouse sand.
Conditions Sand Gradation Limits

Hole sieve (mm)

Translucent cumulative weight (%)

Hole sieve (mm) Weight Translucent cumulative (%)
Zone 1 Zone 2 Zone 3 Zone 4
Lower Upper Lower Upper Lower Upper Lower Upper
10 100 100 100 100 100 100 100 100
4.8 90 100 90 100 90 100 95 100
2.4 60 95 75 100 80 100 95 100
1.2 30 70 55 100 75 100 90 100
0.6 15 34 35 59 60 79 80 100
0.3 5 20 8 30 12 40 15 50
0.15 0 10 0 10 0 10 0 15

Description:
Zone 1 = coarse sand
Zone 2 = A little coarse sand
Zone 3 = Sand Smooth
Zone 4 = A little fine sand

Bamboo House Construction





Planning and design of this house came from the concept of family and number of family members. The period of the building is divided into three areas. The first area is the eastern area of ​​the building mass to parent, is private. The second area is open bamboo couch in the middle of the country for common areas, are public. The third area is west of the building mass on the surface children are semi private. The concept of physical form and layout of the mass of the building itself adapted to the presence of nine clove tree is already in the country for the commencement of building construction. This has led to the emergence of the concept of lean construction. The realization is the mass of the building is designed with a modular system with a column spacing of 3.5 to 4 meters are placed under the clove trees that grow fast and are still productive.
Building mass and the mass of the building East-West each stand alone. All bedrooms are on the floor of each building mass, so privacy is more awake. The ground floor consists of bedroom, dining room and pantry, large kitchen and Musala. To the ground floor, both the mass of the buildings connected by an open bamboo couch that is the center of this house. Couch is large enough, which is 50 m2 and designed without walls and doors that open access to the front of the house and into the back of the house. Bamboo bed bamboo and bamboo bridges using bamboo flooring intact. His logs by means of bolts techniques.
For the top floor, has two masses connected by a bridge building also designed an open bamboo. This bridge just above the couch bamboo that also serves as a roof for the couch. This bridge is scheduled to be given a roof covered with a tent structure. This open space designed to be interwoven relationships and harmony between the inner space and outer space.
Finally, we desire designer and owner of this house who try to the concept of green architecture to implement the concept of recycling, respect for the existing presence of clove trees to see the use of bamboo materials diitegrasikan innovation with the use of waste materials that a work of architecture and environmentally friendly are worth our shared appreciation.

lightweight steel roof


Lightweight steel structure which is believed to provide benefits in terms of life and power, it has a different behavior compared to the structure of the wooden horse. The structure of the wooden horses have larger dimensions than the mild steel structures, especially in terms of thickness of the profile. Lightweight steel construction has a dimension that is thinner than wooden horses, ranging from a thickness of 0.75 mm to 1 mm thickness. Steel frame can be found for example in lightweight steel roof.

With a relatively smaller size, of course, mounting systems, lightweight steel construction with a different mounting wooden horses. Lightweight steel construction has a high tensile strength, yet a weak stiffness. Therefore, one of the main factors that the strength of mild steel structure to determine pangaku rods, steel structures often referred to as braces.

Boning is used to brace or a weak mild steel stiffness to anticipate. Many types of bracing or stiffeners in steel structures, ranging from the root ribs, ribs upper stem, wind bands, or web reinforcements which functions and placements depend on the calculations and the roof load. Maybe you also know that the steel roof. Less or not good for bracing and stiffening in steel structures, can lead to unwanted risk, the risk of the worst that can happen is the failure of mild steel structures to result in a roof cave-in.

Therefore, a point that should be considered in the use of lightweight steel structures, such as stiffness or steel roof bracing. With precise calculation, lightweight steel construction is the best solution replacement wooden horses.

Kamis, 27 Oktober 2011

If You Wan Building Home

Everyone must strive and desire for his own home probably by buying from the developer or build your own.
Maybe if you're planning on buying a home by the developer so you do not have much trouble with the process as people who want to build a house, you just come to the location of the property you want, come then the market section, select the cluster you want and finish.
Unlike the procedure if you want to build a house or use the services of the architect / contractor or done alone.
Well here are some things needed to build the house, so that everything runs smoothly, you need funds in addition of course.
1. Choosing the location of the country,

    
Choosing a location where we are going to build houses is a job that demands precision, not only technical aspects, as well as some other aspects that help to determine if the economic aspect, the performance is also another aspect that can be used as the basis for selecting the location of the country we built the house later.

    
Economic aspects: Perhaps the economic aspect is more forward side of the land value when viewed in terms of investments, or the value of the land and the environment in line with the price of the buildings that will be planned, such as the location of land located in an area of ​​less strategic (in the alley, in dense residential areas, will be in suburban areas with difficult access, etc.) Build Homes with a value of over $ 500 million, given the economy than the value of buildings and land values ​​are not consistent with economic principles, especially if the house sale prices will also fall, but prices are high buildings, it is caused by a change in circumstances that do not support. It is therefore advisable to choose the location of the land in accordance with the development plan, or if we have the land, in locations that are economically less favorable, then the development must also be adjusted to the value of the existing ground.

    
Aspects of merit: The reason for the choice of location can also be seen from the aspect of this performance, we usually measure the achievement of this aspect of the routine activities of our daily activities like work, school children, and realization of other facilities such as entertainment and commerce. The closer the location where we want to build a house which we work, school children, entertainment and commerce, then that location will be increasingly positive values ​​of the aspect of this performance, and this will also affect the economics of the course.

    
Technical aspects:
2. Looking for information on the price of the building, architectural model or trend

    
Once we have the perfect place where we build a house, then the next step is to gather information as possible about the housing plans, information on the price of the current building to collect, to look at the products of building materials, such with a walk in the supermarket building, which we shape and the price of building materials to see. What is important is to maximize information about the House is to gather, to emerging trends in architecture today, see, for example by looking at housing fairs, reading magazines or tabloids home, you can also find information on the Internet on housing and other information on your way to the house to collect.
3. Architects to help design house to

    
If we are sick, we seek a doctor to cure our diseases, if we damaged car and then we look for a mechanic to fix our cars. And who do we need if we want to build a house? Of course we are looking for an architect. Sometimes a lot of people think that what we have to pay an architect, but we just want to build a small house, sometimes this kind of thinking often comes to mind about how many people need to ask an architect for house designs that will us that often "expensive certainly use the services of an architect to build a house". Think this is what we should delete, architects often only provide the solutions we build house plans, architects usually a good solution in terms of design and buget also provided for the construction of the house plans to the opportunities we have to adapt . An architect actually give you a clearly-elasnya on the design and costs later be made, even with the services of architects, we work as much as possible to avoid work that would later lead to waste, apart pairs due to insufficient planning done earlier, in comparison to services to be paid to an architect even more, not a design that results can not be content to mention.

    
By using the services of an architect, then we end result of the design using sketches of the design or due to advances in technology today show, we can also result from the design exactly as the original with the help of computer animation.
4. The management of licenses

    
Once we have a picture of the housing plans, the next stage is the stage where we began administering the licensing of home plans, that is by taking care of building permit (IMB) in the government of the village, district to the mayor . Land surface also determines the extent to which we provide the IMB, the vast land of less than 200 M2 IMB generally quite managed to District alone, but if we land area of ​​more than 200 M2 arrangements could be up to the mayor.

    
The following are the conditions that ensure the IMB (Banguan Permit):

        
* Copy of ID card applicants
        
* The power of attorney, if the signature is not done by the applicant himself
        
* Copy of proof of ownership of Land Rights, approved by the competent authority
        
* Copy of building plans Photos with description
        
* Copy of the settlement of the United Nations (land and buildings tax) last
        
* Fill in the form that has been provided in the district or mayor
        
* Permits neighbors with several buildings.
5. Process Development Agreement

    
Development Agreement process is the process by which we are entering a phase in which plans housing starts, either alone or in doing done by the architect or contractor. Process Development Agreement is required to address the problems that arise during construction to avoid walking. If doing your own, we have a minimum of the performance of the foreman or handyman physical exhibits do our house, here we must determine the rules and requirements to be met, such as working hours, overtime pay, payment terms etc. ..

    
Otherwise, if we are the services of contractors, where all the problems with the craftsmen we may never know, we know the value of the contract between the client and our contractors engaged in the development and implementation schedule to use. In the process of this agreement for the development should be mentioned article â € "the article is clear and fine details of the material conditions that will be in use, the quality and the quality is also mixed â €" a mixture of materials, and so on. The articles are generally included in the agreement are:

        
* Article 1. Duties and Working Hours
        
* Article 2. Conditions and quality materials
        
* Article 3. Price Contracts
        
* Article 4. Payment
        
* Article 5. Also work
        
* Article 6. Other
        
* Closing
6. Development Control

    
Development Control, as doing their own

    
Supervision of construction that was done on the project itself will differ from the project was done by the contractor. If the project in general, do yourself the toughest supervision, supervision of labor, using the payment system daily, if not properly supervised the project could be delayed from the schedule already in the set. When using bulk-power system, there is a possibility because builders do not pay attention to the quality of construction to achieve goals. Therefore to note that the system be taken daily or high performance, our ability to adapt to the client, to what extent can we control the project, as we more time, the system can be taken daily payment, but if we have limited time task than the entire power supply system, an alternative provided that the agreement is made regarding the quality of the work as it is unable to be removed at no cost.

    
The risks above are the most common thing to do as a job in itself with the help of builders directly without the services of contractors, in addition to the risks â € "other risks arising from work that is not suitable due to the lack of supervision, etc..

    
Development control was done by the contractor, if
7. Work Checklist

    
Well as the stages of development that can house we say, useful for those who want to build a house.